Arabba / Marmolada / Italy
- ropeway "Malga - Banc" and "Banc . Serauta" as
replacement for the old Marmolada ropeway
system capacity: 900 p/h
- detachable 4 seater chairlift "Padon 2"" as replacement for
the double chairlift
system capacity: 2000 p/h
- double chairlift "Sas de La Vegla" as replacement for a T-bar
system capacity: 1200 p/h
- double chairlift "Cherz 2" as replacement for a T-bar
system capacitiy: 1200 P/h