Snowbird: New for 2006/07 – Peruvian Chairlift & Tunnel
Lift Details
Snowbird recently began a two-year project constructing a new chairlift and tunnel in Peruvian Gulch. By fall of 2006, Snowbird’s original Peruvian lift will be taken out and replaced with a new high-speed quad.
While the base will stay near the original base shack, the top station will be located below the steepest Chip’s Run pitch, an approximately 2,600-vertical-foot rise. At the top of the lift, a 595-foot tunnel with a conveyor lift will provide access to Mineral Basin. The expected completion date of the Peruvian Gulch project is fall of 2006.
Chairlift Stats
Tunnel Stats

Base
area grading
05/30/2006 VS 07/31/2006

86,000-pound
cable delivery
07/25/2006

Some
exterior skin goes on
07/19/2006

The
2nd story goes up
07/12/2006

Bottom
terminal progress
07/05/2006

New
at the base
06/27/2006

From
the Red Tram
06/08/2006

Lowering
the base
05/30/2006

New
lift towers
05/17/2006

Goodbye
old chair
04/24/2006

Inside
the Tunnel
01/26/2006

Top
of the lift
09/21/2005

Tunnel
entrance
09/21/2005