Lift project: Connection of Inntal-Zillertal and the
skiworld Weer-Weerberg-Hochfügen from Weer
The instructions for a study
were handed to the Gröbner ropeway office from the Raika bank and the ski
lift organisation Hochfügen.
The reason being the traffic
situation on the Zillertal-Straße, in order to reduce traffic in the
Weer-Weerberg region and boost the industry!
A connection from Inntal to
Hochfügen is planned with new, detachable, comfort chairlifts.
Pedestrian transportation
only between Weer and Nonsberg
Snow making facilities
initially on lower, sun-exposed slopes
UVP-procedure will be
necessary
Route:
Weer-Weerberg-Nonsberg-Nonsjöchl (in a southern direction only tree-free
areas will be targeted)-Metzen-connection Hochfügen
Planned Ropeway facilities
.
Weer-Weerberg-Nonsberg
(2.000 P/h, L 5.300m, HD 1.370m) A single-rope ropeway from
Weer in two route-stages with midstation next to the GH Schwanner and in the
region of the summit station of the existing Hütteggliftes- to Nonsberg (summit
station) – eventual subdivision of the lengthy route of 3,7 km in the area
of the upper Hausstatt at 1.500 m.
Jöchlbahn (2.000 P/h, L
1.000m HD 410m) Detachable chairlift connecting
Nonsalm and Nonsjöchl (route: 2/3 in woodland)
Metzenbahn (2.000 P/h, L
2.150m, HD 570m) Detachable 6-seater chairlift 400m south of
Nonsalm to the Metzenkopf. Starting point for a direct ride to Hochfügen.
Return journey with the Lamarkbahn from Hochfügen to Weerberg, planned for
construction by the skilift organisation Hochfügen.
For nature conservational reasons only lifts 1 to 3, as connection from
Inntal to Hochfügen, will be applied for.
Pistes
Descents are easy to
intermediate level
The majority of the ski
terrain is in tree-free areas
The ski piste construction
is limited to narrow strips, the alpine pastures need no additional work
whatsoever (nature-friendly!)
Area between Weerberg and
Hochfügen: Length of descent, 11 km
Average altitude: app.
2.200m
Cost estimation
Including secondary facilities, purchase of land, parking lots and ski pistes
with lease costs (no costs included for waste disposal in the base station area)
The project recruiters BM Erwin Eberharter from Weer, his colleague
Hans Tipotsch, TVB-Obmann Hans Schwemberger as well as Othmar Kronthaler and
Hermann Wetscher (skilifts Hochfügen) are hoping for regional support.