10. 09. 2010 | 15:50    

   ropeways.net | Home | 2010-01-25

CWA cabins in Las Vegas: 2 SHUTTLE trains in Las Vegas

After a design and construction period of no more than around three years, the CityCenter project opened in Las Vegas on 16 December 2009.
 
The CABLE Liner Shuttle system supplied by Doppelmayr Cable Car forms an integral part of this biggest ever privately funded real estate project in U.S. history. The 8 billion dollar megaproject comprises 2,800 luxury apartments, three casino-hotels with 5,000 rooms and more than 44,000 mē for shopping malls, restaurants and convention and meeting space, all linked by the people mover supplied by CWA and Doppelmayr Cable Car.

Key Features

  • 650m (2 100ft) system
  • 3000 pphpd (people per hour per direction)
  • Will connect the existing MGM hotels and casinos, Monte Carlo and Bellagio, with an intermediate station, called Sobella, in the heart of CityCenter.
  • Custom-designed in black and gray APM system enhances architecture planned for the CityCenter project project includes 2,800 condominiums, three luxury hotels as well as high-end retail shops and restaurants

Facts
Length: 650 m (2,100 ft)
Configuration: dual track shuttle (with two trains operating independently)
Operating Speed: 37.8 km/h (23.6 mph)
System Capacity: 3,000 pphpd
Stations: 3
Trains: two 4-car trains
Train Capacity: 33 passengers per vehicle - 132 passengers per train













The comments by users do not necessarily reflect the opinion of the editors.
The editorial staff reserves the right to delete comments that civil or criminal
rules violate the morality or otherwise the reputation of the media can harm.
In this case, the user can not raise claims.
As a poster you are liable for all of your published articles
and can also use the courts to be held accountable.
Furthermore, Seilbahn.net reserves to damages claims and to bring the law to show.