ropeways.net | Projects | Archive | 2017-08-04

Pats Peak: New Peak Triple Chair

The ole Peak Double Chair was a good one. But with the new triple chair lift Pats Peak will be doubling the capacity of the lift from 800 to 1,600 people per hour. Also, they will be deploying some newer technology at the bottom of the lift with a conveyor carpet system that will make loading easier and faster, cutting down on the ride time to the summit.






Back
Add Photos
Print


Google Adsense