ropeways.net | Home | Ropeways | 2024-04-29

Lift Upgrades Coming to Bear Valley

California Mountain Resort Company has revealed its first major capital projects at newly-acquired Bear Valley. In an email to passholders, Bear Valley explained the plan includes changes to four different lifts in the main base area, improving the experience for beginner and intermediate skiers. “We’ve got some major lift improvement projects lined up for this summer, and they’re going to completely transform the Bear Valley base area,” the mountain wrote.

First, the Koala double will be removed and replaced with a used fixed grip quad. Koala dates back to 1968 and the new machine is a 1992 Poma fixed grip quad recently removed from Taos, New Mexico. For the second project, the Kuma triple will be shortened from its original length to become a beginner lift with the top station moving downhill. Kuma hasn’t been needed in its current base-to-summit configuration since the parallel Mokelumne Express opened in 2017. As part of the Kuma project, the existing Cub double will be retired. That lift dates back to 1967 and will be made redundant by the shortened Kuma chair. Finally, the Super Cub double will receive new chairs that will be easier for beginners to load. This entire lift shuffle is expected to be completed this summer and will reduce the mountain’s fleet of of aging Riblet lifts from four to two. In addition to base area projects, Bear Valley also expects to complete significant summer grooming and lift repairs in Grizzly Bowl.

Article by Peter Landsman

http://www.liftblog.com



Back
Add Photos
Print


Google Adsense